Presented to

healthcare construction

Project Experience

Geri-Psych Conversion OSHPD

Renovation of existing laboratory and delivery space in to a Geriatric-Psychiatric services unit and various ancillary support spaces.

Including demolition of the whole hospital wing and rebuild Geri-Psych unit Structural Steel, Structural Concrete, Rough Carpentry, Cold Formed Metal Framing, Drywall, Mechanical, Electrical, Plumbing, Fire Alarm, Fire Sprinklers, Security system & Low Voltage, Nurse call system, Medical gas, Expansion joint system, Roofing, Acoustical ceiling, Suspended Hard lid ceiling system, Anti ligature Doors, Frames, Hardware, lighting and plumbing fixtures and restroom accessories, card reader system and finishes.

797/800 Pharmacy Compounding Rooms Renovation OSHPD

San Dimas community Hospital, Montclair community Hospital

Remodel of existing Pharmacy space to provide compounding spaces within existing pharmacy compliant with FDA and California board of pharmacy UPS-797 and UPS-800 regulations.

Demolition, Structural concrete, Structural steel, Framing, Drywall, HVAC & HEPA systems, Electrical, Plumbing,  Automatic Doors and controls, Eyewash station, Restroom remodel, Fire alarm, Fire Sprinklers, security system, doors, Windows, Equipment installation, seismic anchorage, and finishes.

CT Scan Remodel OSHPD

San Dimas Community Hospital, Montclair Community Hospital, South City Hospital

Replace Existing CT Scanner equipment with new CT Scanner and upgrading CT scan room and control room along with Mobile CT Scan trailer anchorage and it’s Canopy.

Demolition, Footing, site concrete, structural steel, Framing, Drywall, Lead lining,  Mechanical, Electrical, Plumbing, Low Voltage, Fire Alarm, Fire Sprinklers, Lead windows and doors, Ceiling supports, seismic bracings, coordination with equipment manufacturer delivery and installation, Millwork, Finishes.

Infrastructure Upgrade OSHPD

Glendora Oaks Hospital

Upgrade to existing Electrical & Mechanical infrastructure, construct fenced Electrical yard, Boiler room with Equipment yard and two electrical rooms with the required structural supports and seismic bracings.

New Hot water Generator 600KW/750kva, 3300 Gal Tank, 3000Amp Switchboard, ATSs, Panel boards, Electrical control center upgrade. New Air Cooled Water Chiller, Two new boilers, CHWPs, HHWPs, SPs, Chemical Pot Feeders, Air separators, Fan and cooling coil equipment and water softener system upgrade.

Sterilizer Replacement OSHPD

Sherman Oaks Hospital, Centinela community Hospital

Replacement of existing sterilizer with new including adding structural supports and refresh sterilizer room.

Demolition, Ceiling framing, HVAC Plenum reroute, 2hours shaft rebuild, Structural steel, Fireproofing structural elements, Plumbing, seismic bracings, electrical, HVAC, Finishes

Omnicell Replacement OSHPD

St. Francis Medical Center, Chino Valley Medical Center

Swap of 120 existing Omnicell with new including existing anchorage investigation, new seismic supports and install new machines.

Investigation, de-anchorage, through bolts, moving existing machines to staging area, installation of new supports and through bolts, low voltage and programming coordination, installation of new machines.

Children's Hospital Autism Center

Conversion of the 1st & 2nd floor of existing 2 story Medical office building to Autism center at Children hospital Orange County.

Including demolition, Rough carpentry, Concrete, Framing , Drywall, Acoustical ceiling system, Hardlid ceiling, Millwork, Mechanical, Electrical, Plumbing, Fire Alarm, Doors & Frames, windows,  Fire Sprinklers, Roofing, Low Voltage, Signage, Finishes (Flooring, Paint, Accessories…)

South City Hospital Remodel

Variety of projects including New solar exterior cladding system, Solar carports & rooftops, Chiller and AHU upgrades, Boiler replacements, Lighting upgrade throughout the hospital,  Cath lab, Radiology, CT Scan, Fluoroscopy and Nuclear medicine remodel, Emergency department upgrade & Kitchen equipment installation.

Behind the scenes FOR GLENDORA OAKS

NICK AMINI, VICE PRESIDENT OF CONSTRUCTION

Behind the scenes Sherman Oaks Hospital

Paul Jett, Project Manager

BY THE NUMBERS

Projects Completed
1567 +
Combined Experience
0 +
BR TEAM NETWORK
758 +

EMERGENCY DEPARTMENT REMODEL & CONVERSIONS

CARDIOVASCULAR UNIT UPGRADE

Psychiatric Unit Conversions

INTENSIVE CARE UNIT UPGRADE

OSHPD SEISMIC BRACING

ELEVATOR MODERNIZATION

WOUND CARE UNIT UPGRADE

PATIENT ANTI- ROOMS UPGRADES

What to expect

Pre Construction

“Design is a plan for arranging elements in such a way as best to accomplish a particular purpose”

What to expect

During And AFTER Construction

Safety Compliance and Protocols

Live updates and online visibility

Dedicated Project Team

Single Point of Contact

MEET THE TEAM

Nick Amini

Vice President

Paul Jett

Project Manager

Sabha Amini

Senior Project Engineer

Robert Del Maro

Project Manager

Javier Carmona

General Superindendent

Richard Montoya

Superintendent

We're ready for you

Let's connect

We’d be happy to talk through all the details and let you know exactly how we can add value to your project and your team. Click below and let’s jump in!

join us in championing the people who build